Contract Name Client Name Description of work 
Infrastructure Return Bypass in Jubail, 065-C42 Royal Commission for Jubail & Yanbu Construction of 2 x 4000 mm ID Sea Water FRP Pipeline.
P&C of Pipeline Corridors, 204-C36 Royal Commission for Jubail & Yanbu Procurement and Construction of Pipeline Corridors in Jubail Industrial City
P&C of De-Bottlenecking of Pipeline Corridors Royal Commission for Jubail & Yanbu Procurement and Construction of De-Bottlenecking facilities for Royal Commission Pipeline Corridors and King Fahd Industrial Port at Jubail.
Infrastructure for Hail University Ministry of Higher Education Site Works for Hail University.
Al-Waha PDH PP Project TechnoMont/Daelem Foster Wheeler Construction - GRP Piping works off sites and related civil works.
KFUPM Student’s Housing, Phase II, Contract # 6035 King Fahd University of Petroleum and Minerals (KFUPM) BI – Building – 9 Typical Three Storey (6+2) having a built up area of 3,720 M2.
Al-Mirtan Location, Provision of Civil Works South Rub Al-Khali Co. Ltd. (SRAK) Construction of 215 KM Earth Road and 2 Wellsites Pad and Infrastructure.
Construction of two Todd Treatment Units in Hofuf, Phase III Ministry of Water & Electricity, Al-Hassa Construction of two Todd Treatment Units in Hofuf (Phase III).
P&C of De-Bottlenecking of Pipeline Corridors Royal Commission for Jubail & Yanbu Procurement and Construction of De-Bottlenecking facilities for Royal Commission Pipeline Corridors and King Fahd Industrial Port at Jubail.
Provision of Civil Works Services. South Rub Al-Khali Co. Ltd. (SRAK) Construction of 81 KM Earth Road and Wellsite Pad.
Electrical Substation & Cabling, PIC B-1169 Royal Commission for Jubail & Yanbu P & C of 34.5 kV Substation No. 12L and 34.5 kV, Street Lighting and Traffic Controllers & Signals.
Imarat Al-Madinat Al-Munawarrah Imarat Al-Madinat Al-Munawarrah Construction of Governorate Office Complex with three Basement levels and five story building including Car parking.
P & C Power Supply to Community Area Royal Commission for Jubail & Yanbu P & C of 13.8 kV cable laying (Approx 40 KM), 100 meters of thrust boring and installation of 13.8 kV RMU & EOS.
P & C of Site Development of Al-Fanateer Peninsula Royal Commission for Jubail & Yanbu Site development Project. RDS, Infrastructure utilities (storm water, sewer, and potable & fire water, electrical, irrigation & landscaping).
Sea Water Chlorination System, 072-P23A Royal Commission for Jubail & Yanbu Lump-sum Turnkey Contract for the design, supply, Installation Testing and Commissioning of 211 KG/Hr x 4 Streams Phase II.
Dualization of the Road Connecting KFIA and Ibn Signals Nasser Hazza & Brothers Street Lighting of Dammam Airport Road (Approx 26 KM) including intake switchgear, package sub-station and MV & LV Cable Laying.
Sea Water Chlorination System, 072-P22A Royal Commission for Jubail & Yanbu Lump-sum Turnkey Contract for the design, supply, Installation Testing and Commissioning of 211 KG/Hr x 4 Streams Phase I Chlorination System at Sea water Cooling Intake structure.
Procurement&Construction of Six Schools, PIC G-1611 Royal Commission for Jubail & Yanbu Construction of Six (6) Elementary School Buildings in Yanbu.
School Buildings Royal Commission for Jubail & Yanbu Construction of Ten (10) School Buildings in Jubail.
Airplane Hangar McDonnell-Douglas Services Inc. Construction of Airplane Hangar, Dhahran.
Contract Name Client Name Description of work 
Preparatory Year Building King Faisal University Construction of building consists of three floors with total area 19,200 M2.
College of Computer Science (Female), B-01 King Faisal University Construction of building consists of three floors with total area 24,347  M2.
College of Science (Gilrs') B-02 King Faisal University Construction of  building consists of three floors with total area 24,000  M2.
Deanship Building in Al-Hassa, Phase I, B-05 King Faisal University Construction of building consists of parking basement and three floors with total area of 22,600  M2.
Faculty of Edu. (Girls') in Al-Hassa, Phase I, B-32 King Faisal University Construction of building, two floors with service basement, total area is 29,000  M2.
College of Education [Male], B-13 Taibah University Construction of building, four floors with 50,869  M2.
College of Science (Girls') B-21 Taibah University Construction of building, four floors with 41,342  M2.
College of Education (Girls') B-23 Taibah University Construction of building, four floors with 41,342  M2.
College of Financial and Administrative Science in Madinah, B-12 Taibah University Construction of building, four floors with 23,000  M2.
College of engineering in Jazan university Ministry of Higher Education Construction of building consists of GF + two floors with built up area of 50,000  M2.
P&C of Infrastructure for Labor Camp, 021-C04 Royal Commission for Jubail & Yanbu P&C of Pumping Stations and Storage Tanks for Potable Water and Irrigation Water System.
Facilities Security Training Center in Eastern Province Ministry of Interior Construction of 39 buildings and 17 monitoring towers with a build area of 124,000 M2.
Administration, Conference Hall & Deanship Buildings Taibah University Construction of three buildings with total built up area of 83,650 M2 including all structural works.